Sök:

Sökresultat:

588 Uppsatser om Sapa Heat Tansfer - Sida 1 av 40

Sapa Heat Transfers koldioxidspår : En kartläggning av verksamhetens koldioxidutsläpp

Sapa Heat Transfer is a company that produces aluminum heat-exchanger strips for the automotive industry. Sapa Heat Transfer wish to chart their emissions of carbon dioxide in order to meet future demands on carbon dioxide reporting. They also would like to examine the meaning of the term ?green electricity? which is marketed as carbon dioxide free, and the sort of electricity that they purchase. This report includes both direct (liquefied petroleum gas and diesel) and indirect (water, process-water, long distance heating, waste) emissions from their company.

Spillvärmeåtervinning ur kylvattensystemet ismältverket på Sapa Profiler AB i Sjunnen

The smelting process at Sapa Profiler AB in Sjunnen generates large quantities of waste heat which is absorbed by the cooling water when the aluminum is cooled down. This paper is the result of a Master?s Degree Project aiming to present the conditions for recycling the waste heat. The cooling water absorbs the heat from the aluminum at an average rate of 600 kW and the paper shows that it can be used to replace electrical power consumption for heating the production plant?s facilities.

En studie hur Sapa Profiler AB kan använda sig av sociala medier i sitt varumärkesbyggande

BakgrundJag har fått i uppdrag av Sapa Profiler AB att ta fram konkreta förslag på hur de skulle kunna använda sig av sociala medier i sitt varumärkesbyggande.SyfteGe Sapa Profiler AB konkreta åtgärder på hur de kan använda sociala medier i sitt varumärkesbyggande.MetodJag har använt mig av kvalitativa intervjuer, benchmarking, netnografi och dokumentanalyser av Sapa Profiler AB:s eget material.ResultatJag har gett olika förslag på hur Sapa Profiler AB kan använda sig av sociala medier för att stärka sitt varumärke..

Energieffektiv processventilation för aluminiumvarmvalsverk

Syftet med detta examensarbete har varit att genomföra en nulägesanalys av Hall 7 på Sapa Heat Transfer AB i Finspång. Utifrån nulägesanalysen togs åtgärdsförslag fram som kan generera en effektivare uppvärmning, mindre yttre utsläpp och behagligare arbetsklimat. Problemet i Hall 7 är att processventilationen för varmvalsverk 2051 är ålderstigen och underdimensionerad, den saknar även värmeåtervinning och rening av processfrånluften. Detta leder till oplanerade driftstopp, höga underhållskostnader samt hög energianvändning.För att finna åtgärdsförslag för dessa problem genomfördes en nulägesanalys av Hall 7 genom att mäta luftflöden och temperaturer, analysera utsläppsmätningar och energianvändning samt intervjua personal.Utifrån dessa mätningar har fyra olika åtgärdsförslag tagits fram. De fyra åtgärdsförslagen är benämns: YIT, YIT (Enklare), Homehall och Ökad tilluft.Det åtgärdsförslag som anses vara bäst lämpat för att generera en effektivare uppvärmning, ge mindre yttre utsläpp samt ett behagligare arbetsklimat i Hall 7 är åtgärdsförslag Homehall.

Nyutveckling av bakdörrar vid Sapa Building System AB

Sapa är en av de största tillverkarna i världen av aluminiumprofiler. Sapa Building System AB är ett dotterbolag till Sapa group och är en av de största leverantörerna i Europa på byggsystem. Några av deras produkter är bakdörrarna RD 3010 och RD 3020 för lastbilar, släp och trailers som från början var ämnade som sidodörrar. Som bakdörrar är de överdimensionerade då sidodörrar hade högre hållfasthetskrav. I dagens läge väger och kostar de mer än nödvändigt där av önskar Sapa Building System AB en nyutveckling av bakdörrarna.Målet är att omkonstruera bakdörrarna RD 3010 och RD 3020 så att de blir lättare, smidigare och billigare genom att konstruera en ny kantskoning till Sapa Building System AB:s befintliga aluminiumlämprofiler.Arbetet har resulterat i att ritningsunderlag för nya profiler har tagits fram där man valt att limma ihop dörrarnas delar istället för att nita.

Spillvärmeåtervinning

SAPA´s resource of waste heat is the basis for this thesis to investigate the possibility of energy assets in their cooling water and possible uses for it. The energy in the waste water is greater than the current need which has three uses which are (1) heating the factory, (2) converting liquid propane to propane gas and (3) local domestic heating. The average energy load that is available is 1, 7 MW and the average temperature in the cooling water is 41°C. The total energy load at dimensioning out side temperature is approximately 1,6 MW for the three current uses. The temperature is currently too low to be used directly in the existing systems so an upgrade is needed.

Äldreboendet på Zakrisdal : En studie om solvärme med säsongslagring

A home for elderly is planed to be built at Zakrisdal, Karlstad, Sweden. The heat source for the building was at the time not determined. In order by the local government of Karlstad this report is meant to examine if the need of heat could be provided only by solar heat combined with a seasonal heat storage. The problem to solve is, if the need of heat from the home for elderly is provided from only solar heat, whitch dimensions of the solar collectors and the storage is needed?.

Norrkila arena : visuell beskrivning av arena

A home for elderly is planed to be built at Zakrisdal, Karlstad, Sweden. The heat source for the building was at the time not determined. In order by the local government of Karlstad this report is meant to examine if the need of heat could be provided only by solar heat combined with a seasonal heat storage. The problem to solve is, if the need of heat from the home for elderly is provided from only solar heat, whitch dimensions of the solar collectors and the storage is needed?.

Fluidrörelse- och värmetransportsmodellering i götugn

The purpose of this thesis for Sapa Heat Transfer is to examine a furnace in which aluminium is pre-heated before hot rolling. The project is modeled in a computer environment in which the air flow in the furnace and the heat transfer to the aluminium solids are included. The computer environment and its governing equations, as well as boundary conditions and generalizations, are presented and explained.The simulations are based on two models. The first model has an asymmetric solid placement, which is how it looks in today's ovens. It is validated against collected data.

Kylapotentialen i Drefviken för Vattenfall Heat AB

Vattenfall Heat AB is a district heat provider in Drefviken, but has yet to establish any cooling systems in this area. This thesis examines the potential client base within the area today and over the coming 20 years. The feasibility of the most common cooling technologies is evaluated and results show a total potential for an installed capacity of 30 MW providing 50 GWh of cooling per year. One of the examined areas shows good prospect for heat driven absorption chillers during the summer months when the heat load is limited..

Frånluftsvärmepumpens möjligheter i flerbostadshus

If a building is heated by a heat pump, it is of high importance that the heat pump has a high coefficient of performance. An exhaust air heat pump extracts heat from the building?s exhaust air. The air has a relatively high and constant temperature all year around, leading to a high seasonal coefficient of performance. This thesis examines whether it is profitable to complement an exhaust ventilation system with an exhaust air heat pump in an apartment block that already has geothermal heat pump, district heating, oil- or biofuel heated system.

Intern hantering som orsak till defekter: ett Sex sigma
projekt för analys och åtgärdsförslag på Sapa Heat Transfer AB

Detta examensarbete har utförts på Sapa Heat Transfer i Finspång och har tagit upp frågan med hur den interna hanteringen av produkterna kan orsaka defekter. I arbetet har en typ av defekt undersökts särskilt och denna defekt kan ses som ett exempel. Företaget tillverkar aluminiumband till värmeväxlare, främst till fordonsindustrin. Banden levereras på rullar med en diameter upp till 1700 mm, och en bredd mellan 12 mm och 1440 mm. Syftet med detta examensarbete är undersöka en defekt som är orsakad av den interna hanteringen, det vill säga det som sker mellan produktionsstegen.

Restvärmeåteranvändning från absorptionsvärmepumpar : en kartläggning av möjligheter och begränsningar vid Vattenfall Värme Uppsala Block 5

Vattenfall district Heating power plant in Uppsala produces district cooling with absorption heat pumps which leads to a large amount of waste heat that has to be cooled with evaporative cooling towers. The Environmental Court has ordered Vattenfall to survey the possibilities to recover the heat, which is the focus of this thesis.The study begins with an overview of the system, and conditions and limitations for waste heat recovery is examined. In the next step alternatives to recycle the heat is evaluated, either by direct recovering or by upgrading.First, the technical possibility of each alternative is discussed, and then the operation time and the amount of recovered heat is calculated. Those alternatives which are possible are brought further to an economic analysis.The cost of investment for each alternative constitutes the basis for a present value analysis. The results are put together in a table where the total amount of recovered heat is compared with the present value for the different alternatives.

Vidareutveckling av skrotfallsprognos : på Sapa Heat Transfer AB

Sapa Heat Transfer AB (SHT AB) är en av tre delar inom koncernen Sapa Group, som ägs av det norska företaget Orkla ASA. SHT AB har produktion både i Sverige (Finspång) och i Kina (Shanghai). Företaget är en världsledande leverantör och utvecklare av aluminiumband som används i olika typer av värmeväxlare, främst inom bilindustrin.I flera steg av produktionen, som innefattar omsmältning, varm- och kallvalsning samt skärning, uppkommer ett skrotfall av aluminium. Detta skrot tas omhand och återanvänds som råvara i företagets omsmältverk. SHT AB har idag inget automatiserat IT-stöd för att prognostisera skrotavfallet, dessa beräkningar görs istället med hjälp av Excel.

Kartläggning av material flödesflaskhals i ICA butik.

In the spring of 2014 Sweco Systems AB were commissioned to design a ventilation system for a newly built preschool in Linköping. Terms from the client was that it cost efficiency would cope with the energy demands that are placed on the building. The unit chosen was a cross-flow heat exchanger, and this work is to compare it with two other heat exchangers to see if a more energy and cost efficient could have been chosen. The heat exchangers that was chosen for the comparison was a rotating- and a counterflow heat exchanger. Simulations have been made to the different heat exchangers by the manufacturers.

1 Nästa sida ->